Summit Avenue station (MBTA Green Line C branch)

Last updated

Summit Avenue
Outbound train at Summit Avenue station (1), September 2024.jpg
An outbound train at Summit Avenue station in 2024
General information
Location Beacon Street and Summit Avenue
Brookline, Massachusetts
Coordinates 42°20′27″N71°07′31″W / 42.340946°N 71.125182°W / 42.340946; -71.125182
Platforms2 side platforms
Tracks2
History
Rebuilt2026 (planned)
Previous namesWinchester Street
Passengers
2011945 (weekday average boardings) [1]
Services
Preceding station MBTA.svg MBTA Following station
Brandon Hall Green Line Coolidge Corner
Location
Summit Avenue station (MBTA Green Line C branch)

Summit Avenue station is a light rail stop on the MBTA Green Line C branch, located in the median of Beacon Street between Winchester Street and Summit Avenue in the Coolidge Corner neighborhood of Brookline, Massachusetts. The stop has two low side platforms that serve the line's two tracks; it is not accessible.

Contents

History

Until around 2004, the station was listed as Winchester Street to avoid confusion with Summit Avenue stop on the B branch. [2] The B branch stop was closed as part of a pilot program in April 2004 (after which the C branch stop became Summit Avenue) and permanently closed the following March. [3] [4] [5]

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. [6] Design work for Summit Avenue and seven other C Branch stations was 15% complete by December 2022. [7] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Summit Avenue. [8] The MBTA awarded a $41.9 million design-build contract in April 2025. [9] Designs shown in February 2026 called for the platforms to be shifted westward, with access from both Marion Street and Summit Avenue. As of February 2026, construction is expected to take place from spring 2026 to fall 2026. [10]

References

  1. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. "Green Line/Train C". Massachusetts Bay Transportation Authority. Archived from the original on April 4, 2004.
  3. "Green Line B Branch Service Enhancements" (PDF). TRANSreport. Boston Regional Metropolitan Planning Organization. May 2004. Archived from the original (PDF) on November 26, 2010.
  4. Daniel, Mac (March 16, 2005). "T drops 4 Green Line stops after results of rider survey". Boston Globe. Archived from the original on March 18, 2005.
  5. "Green Line/Train C". Massachusetts Bay Transportation Authority. Archived from the original on June 3, 2004.
  6. Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
  7. "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
  8. Dunlevy, Gwen (April 24, 2025). "MBTA Construction Contract No. A26CN04 Design Build Green Line C Branch Short Term Accessibility Improvements" (PDF). Massachusetts Bay Transportation Authority.
  9. "Tree Planting Committee Meeting 02.03.2026 Presentation". Town of Brookline. February 3, 2026.

Commons-logo.svg Media related to Summit Avenue station (MBTA Green Line C branch) at Wikimedia Commons


自动镜像站群 蜘蛛池+镜像 烟雨镜像程序 关键词转码站群 整站镜像下载