英文互译镜像站

FS E.323 and E.324

Last updated
FS locomotives E.323 and E.324
Genova - stazione ferroviaria Brignole - locomotiva E.323.018 - 10-03-1996.jpg
FS locomotive E.323.018 in service at Genova Brignole railway station on March 10, 1996
Type and origin
Power typeElectric
Builder Tecnomasio
Build date1st series: 1966-1967; 2nd series: 1970-1971
Total produced30 E.323 + 10 E.324
Specifications
Configuration:
   UIC C
Wheel diameter1,040 mm (41 in)
Wheelbase:
  Leading4,000 mm (13 ft) (1,500 + 2,500 mm [4.9 + 8.2 ft])
Length9,240 mm (30.31 ft)
Height3,700 mm (12.1 ft)
Loco weight46 tonnes (45 long tons; 51 short tons)
Power supply Direct current at 3 kV
Gear ratio1:15.8 (Vmax32 km/h [20 mph]);
1:7.54 (Vmax 64 km/h [40 mph]).
Performance figures
Maximum speed64 km/h (40 mph)
Power output:
  1 hour210 kW (280 hp)
  Continuous190 kW (250 hp)
Tractive effort:
  Starting147 kN (33,000 lbf)
  1 hour91.2 kN (20,500 lbf) at 6.66 km/h (4.14 mph)
  Continuous82.4 kN (18,500 lbf) at 7.44 km/h (4.62 mph)

The E.323 and E.324 were two classes of 3,000 V direct current electric locomotives operated by the Italian State Railways (FS), primarily used for shunting duties in large rail yards. The E.324 class lacked both a driver's cab and a pantograph, and was designed to operate in multiple unit control with the E.323 class, effectively doubling the latter's performance.

Contents

These locomotives were a development of the FS E.321 and E.322 classes. They retained the electrical systems of their predecessors, updated based on operational experience and technological advancements, while the mechanical components were newly designed. [1]

In the early 1970s, as part of a collaboration between FS and the Faculty of Engineering at the University of Rome "La Sapienza," an E.323 unit was selected for the development and testing of an electronic converter intended to power a three-phase traction motor. This project, which would have marked the first application of a three-phase traction motor in a 3 kV DC locomotive, was eventually abandoned due to advancements in power electronics associated with the development of the E.402 class locomotives.

History

Project

In the second half of the 1960s, the positive operational results of the E.321 and E.322 classes prompted the Italian State Railways (FS) to expand the use of electric locomotives for shunting services. In the development of the new project, it was decided to retain the electrical components of the earlier models, while the mechanical parts—such as the carriage, running gear, and brake system—were newly designed. The design followed that of the standardised Class 245 locomotives (units 245.1001–1020, 2001–2020, and 6010–6124). This configuration, using the same GLM 2405 motor as in the E.321 and E.322, allowed for a transmission system employing universal joints and telescopic shafts. It also enabled the use of a gearbox with two gear ratios: one providing a maximum speed of 32 km/h (20 mph) for shunting, and another allowing speeds up to 64 km/h (40 mph) for mainline movements and light freight haulage. As with the E.321 and E.322, the project was developed by FS in collaboration with Tecnomasio Italiano Brown Boveri (TIBB). [2] [3]

Construction

The construction of both the electrical and mechanical components was entrusted to Tecnomasio Italiano Brown Boveri. As with the E.321 class, non-cab units known as "motor trailers" were developed to operate under the control of the cab-equipped E.323 units. These were classified as E.324 and were mechanically identical to the E.323 but without a driver’s cab. Due to this configuration, similar to the E.322 class, they were colloquially referred to as "dogs" (cani). The following subclasses were built: [2] [4]

Based on prior experience with units E.321.200 and E.322.200, locomotive E.323.200 was specially designed and built with the capability to remotely control two E.324.200 units. [2] [5]

Between April and October 1967, locomotive E.323.105 was included in a national exhibition of rolling stock, alongside other locomotives, passenger coaches, and freight wagons. The exhibition took place in major Italian railway stations and aimed to present to the public the ongoing renewal of the FS fleet as part of the Ten-Year Modernization Plan (1962–1972). [6] [7]

Maintenance

Engine trailer E.324.105 and locomotive E.323.105 in the Apulia Railway Museum on March 1, 2018. Museo Ferroviario della Puglia 12.jpg
Engine trailer E.324.105 and locomotive E.323.105 in the Apulia Railway Museum on March 1, 2018.

Locomotives of the E.323 and E.324 classes underwent major overhauls every 40,000 hours of operation. Midway through this interval, an intermediate "R III" overhaul was carried out, which did not require the complete disassembly of the locomotive body. [8] [9]

Operation

Services

The E.323 and E.324 locomotives were exclusively employed in shunting operations. They gradually replaced the last remaining steam shunting locomotives, which were being phased out, and also displaced diesel locomotives and their immediate predecessors, the E.321 and E.322 classes. The latter had already demonstrated strong performance under the demanding, continuous workloads typical of hump yards in large marshalling stations. [10]

In addition to performing shunting duties on station sidings, the E.323 and E.324 were regularly used in major marshalling yards and for ferry operations involving the boarding and disembarkation of trains to and from Sicily, specifically at Messina Marittima and Villa San Giovanni stations. [11] [12]

Due to their design characteristics, these locomotives were only occasionally used for mainline operations or for hauling troop trains. [13] [14] [3]

Performance in shunting service

The shunting performance of the E.323 and E.324 locomotives is detailed in the following table, sourced from the General Preface to the Timetable of Service (Prefazione Generale all'Orario di Servizio, PGOS) [15] of the Italian State Railways. The table specifies the maximum loads, expressed in tonnes, that the locomotives were capable of hauling in shunting service, depending on track gradient.

Tonnage performance of railcars and shunting locomotives in shunting service
ClassGradient ‰Power

HP

3610152025
E.321
E.322 (1)
740550400300240190260
E.323
E.324 (1)
1050770560420340260260
(1) For the pairs E.321 + E.322 and E.323 + E.324, the performance is twice as much as shown in the table.
Performance on the line

The performance of the E.323 and E.324 locomotives in traction and full-line service is presented in the following table, sourced from the General Preface to the Timetable of Service (Prefazione Generale all'Orario di Servizio, PGOS) [13] of the Italian State Railways. The table indicates the load, in tonnes, that the locomotives were capable of hauling in full-line service, depending on the performance classification of the line. [16]

CLASS E.321 — E.322 — E.323 — E.324 — (1)
SpeedPerformance grades of the lines
123456789101112131415161718192021222324
50 km/h65605550454035302525
40 km/h1451351251201101109590807565605550454035302520
35 km/h21020018517516516014513512511510595858075706055504540403530
30 km/h3102902702552402252102001801651501401301201101059590807570656055
25 km/h4404103853603403203002802602402202001901801701601451301201101051009590
20 km/h620570535500475450425400370340315290270250235220205190180170160150140130
(1) For the pairs E.321 + E.322 and E.323 + E.324, the performance is twice as much as shown in the table.

Depots

As of January 1985, units of the E.323 and E.324 classes were distributed across the following depots: [17]

  • E.323.001–020, not equipped for multiple-unit operation with E.324s, were assigned to:
    • Torino Smistamento (1), Alessandria (2), Genova Brignole (3), Savona (1), Verona (2), Fortezza (1), Udine (1), Bologna (3), Florence (1), Pisa (1), Livorno (1), Ancona (1), Bari (1), Foggia (1);
  • E.323 locomotives of the 100 and 200 series, equipped for multiple-unit operation with E.324s, were assigned to:
    • Alessandria (1), Milano Smistamento (2), Verona (1), Udine (1), Reggio Calabria (5);
  • E.324 motor trailers generally followed the assignment of E.323 units with matching numbering. However, FS did not typically report their quantities per individual depot.

As of 31 December 1991, all E.323 and E.324 units remained in service and were distributed as follows: [18]

  • E.323.001–020 were assigned to:
    • Alessandria (3), Genoa Rivarolo (3), Savona (1), Verona (2), Udine (1), Bologna (3), Pisa (3), Ancona (1), Rome San Lorenzo (1), Foggia (1), Reggio Calabria (1)
  • E.323+E.324 pairs of the 100 and 200 series were assigned to:
    • Alessandria (3), Milano Smistamento (2), Verona (1), Udine (1), Foggia (1), Reggio Calabria (2)

According to Haydock (1995), [19] all units of both classes were still in existence and distributed as follows:

  • E.323.001–020:
    • Alessandria (3), Ancona (1), Bologna Centrale (1), Foggia (1), Genoa Rivarolo (3), Pisa Sant'Ermete (3), Reggio di Calabria (1), Rome San Lorenzo (1), Savona (1), Udine (1), Verona (4);
  • E.323.100 series:
    • Alessandria (2), Reggio di Calabria (3);
  • E.323.200 series:
    • Alessandria (1), Milano Smistamento (1), Udine (1), Verona (2);
  • E.324.100 series:
    • Alessandria (2), Reggio di Calabria (3);
  • E.324.200 series:
    • Alessandria (1), Milano Smistamento (1), Udine (1), Verona (2).

Shelving and decommissioning

As of 30 January 2000, all units remained in service:

  • Thirty E.323 units were assigned as follows: FS Regional Division (16), FS Passenger Division (3), FS Cargo Division (11)
  • Ten E.324 units were assigned as follows: FS Regional Division (2), FS Passenger Division (2), FS Cargo Division (6). [20] [21]

Withdrawal began in 2002, [22] and all units were decommissioned between October 2002 and June 2009. [23]

As of today, locomotive E.323.010 remains stored in deteriorated condition at the Rimini Locomotive Depot. [24]

Museum preservation

The E.323.105 + E.324.105 locomotive pair has been preserved and is on loan to the amateur railway association AISAF, based in Lecce. [25]

Features

Following the favorable operational results of the E.321 and E.322 locomotives—whose use led to notable savings compared to diesel traction—the Italian State Railways (FS) decided to acquire an additional batch of similar locomotives. However, for these new units, a completely redesigned mechanical section was developed to meet all the requirements of shunting service. [26]

For the same reasons that had guided the design of the E.321, the Ward Leonard-type control scheme was retained. [27] The locomotives used the same electrical equipment, including a 260 kW (350 hp) double-commutator primary motor powered at 3 kV, [28] and a main generator of TIBB-CGE construction rated at 210 kW (280 hp) at 1,250 rpm, producing 460 V. The traction motor developed 190 kW (250 hp) of continuous power and 210 kW (280 hp) at hourly rating. The only electrical modification introduced was the adoption of field weakening [29] on the traction motor. [30]

Notably, without changing the electrical equipment, the addition of a two-speed gearbox and field weakening led to a significant increase in performance compared to the E.321 and E.322, as illustrated in the PGOS (General Preface to the Timetable of Service) data referenced in the Services section. [30]

Mechanical part

Despite the strong operational results of the E.321 and E.322 classes, their performance was limited by an outdated mechanical design, notably the use of connecting rod transmission and internal bushings with plain bearings. [31]

To address these shortcomings, the E.323 and E.324 classes adopted the mechanical configuration developed for the new "unified" Class 245 diesel locomotives. [32] Key features included: [31] [33]

The gearbox was connected to the traction motor via a coupling with rubber spring elements and transmitted power to the drive decks [35] (Hurt type HSK 19) [34] mounted on each locomotive wheelset [30] [33] with universal joints.

During shunting operations, the low-speed gear (32 km/h) was typically used to provide maximum tractive effort. For light-load or isolated movements, the high-speed gear (64 km/h) could be engaged, though with tractive effort reduced by half. [30] [36]

Gear selection could only be performed while the locomotive was stationary, using an electropneumatic device. [31] This system also allowed the gearbox to be set to a "neutral" position, disconnecting the mechanical linkage to the traction motor when the locomotive needed to be towed. [30]

Electrical part

The electrical system of the E.323 and E.324 locomotives was based on that of the earlier E.321 and E.322 classes, with several modifications introduced based on operational experience with those predecessors. [37]

As in the E.321 and E.322 classes, all electrical machinery—except for the traction motor mounted on the underframe—was located at the front of the locomotive, housed within the forebody. [38]

The electrical equipment included a primary motor fed from the 3 kV DC overhead line, mechanically coupled to the shaft of the main generator, forming a single unit. This unit, via pulleys and V-belts, also drove a second block composed of two DC generators. One generator supplied the auxiliary circuits and recharged the batteries, while the other provided separate excitation for the primary motor. The same assembly also powered a centrifugal fan for cooling the traction motor. On the opposite side of the unit, a compressor was mechanically driven to supply the locomotive’s pneumatic and brake systems. [39]

Traction circuit

The five external features of the main generator selectable with the shunting combiner. GP E.321 FS.svg
The five external features of the main generator selectable with the shunting combiner.
Simplified diagram of the traction circuit of E.323 and E.324 locomotives. Circuito di trazione E.323.svg
Simplified diagram of the traction circuit of E.323 and E.324 locomotives.

A conventional DC traction system—where a motor is supplied with constant voltage—was considered unsuitable for shunting service due to two main limitations: a rapid decrease in torque with increasing motor speed, and high energy losses from the starting rheostat. In shunting locomotives, the rheostat would have needed to remain engaged for prolonged periods and occupy substantial space. [40] Additionally, the modest power requirements made the use of a single traction motor almost mandatory, rendering the speed regulation techniques used in multi-motor mainline locomotives (such as series-parallel switching) impractical. [26] [41]

As with the E.321 and E.322 classes, a system was adopted similar to that used in diesel-electric locomotives. In this setup, the Diesel engine is replaced by a 3 kV DC electric primary motor, [27] resulting in a Ward Leonard-type arrangement, adapted for railway use. [26] [39]

This configuration, largely unchanged from the earlier classes, included a primary motor directly fed from the overhead line, mechanically coupled to a main generator. [28] The generator supplied an adjustable voltage to the traction motor over a wide range, allowing speed regulation without using a series rheostat. [26]

Speed control was managed by the driver using a set of resistors inserted into the excitation circuit of the main generator. Each setting on the shunting controller corresponded to one of five voltage-current curves, known as "external characteristics," depicted in red on the associated performance graph. [42]

These characteristics allowed significant voltage variation in response to load current changes, enabling the generator to limit inrush current and automatically adjust voltage during acceleration. This arrangement fulfilled the same function as a starting rheostat but without energy dissipation. [43]

The only modification to the traction circuit compared to the E.321 and E.322 was the introduction of field weakening for the traction motor. This required the addition of an electropneumatic contactor and an upgrade to the control circuitry. [30]

Control circuitry

The inclusion of traction motor field weakening and a two-speed gearbox (32 or 64 km/h) required additional controls beyond those present on the E.321 shunting console. An interlocking circuit was implemented to synchronize the speed selector settings between the E.323 locomotive and the E.324 motor trailers when operated in multiple-unit configuration. [30] [31]

Electric heating circuit

No electric train heating systems were installed on any units of the E.323 or E.324 classes. [34]

Auxiliary circuits

As with the E.321 and E.322, auxiliary power was provided by a DC generator belt-driven from the primary engine. A voltage regulator connected to the generator managed the control, lighting, and battery charging circuits. [44]

Pneumatic part

Compressed air for the pneumatic controls and braking systems was produced by a Westinghouse 241-P type compressor, [34] mechanically driven by the primary motor. This eliminated the need for expensive 3 kV motor-driven compressors. [39] [42]

An auxiliary electric compressor, powered either by the auxiliary generator or the battery, supplied the air required to raise the pantograph. [44]

Compared to the E.321 and E.322 classes, [44] the following components were added to the electropneumatic system: [30] [31]

Economic considerations

Performance curve of electric locomotive E.323 compared with that of Diesel locomotive 245.Tractive effort is expressed in kilograms-force rather than in Newtons, as was in use at the time. Prestazioni E.323 vs 245.svg
Performance curve of electric locomotive E.323 compared with that of Diesel locomotive 245.Tractive effort is expressed in kilograms-force rather than in Newtons, as was in use at the time.

A comparison with the diesel-hydraulic Class 245 locomotives—featuring a primary engine rated at 368 kW, compared to the E.323’s 260 kW—revealed slightly lower performance for the E.323. This is evidenced by tractive effort curves for both locomotive types in the 0–32 km/h (0–20 mph) speed range. At speeds up to 64 km/h (40 mph), tractive effort is halved for both, although operational conditions remain essentially unchanged. [30]

Due to the lack of official data, economic evaluation was carried out by extrapolating hourly operating costs (excluding train crew expenses) from a 1963 study comparing the electric E.321 locomotives and the diesel Class 235 locomotives. That comparison showed a 27% lower hourly operating cost for the electric locomotives (1,105 Lit/hour versus 1,530 Lit/hour). [45] [46] [47]

Assuming that the operating cost of the E.323 was equivalent to that of the E.321—given the mechanical and electrical similarity—and that the Class 245 locomotives incurred higher fuel costs due to their greater engine power compared to the Class 235, it was estimated that the diesel locomotives had at least 40% higher operating costs than the electric ones, at equivalent performance. [47]

In light of this significant cost difference, and considering that no substantial changes were required in infrastructure or service organization for electric shunting operations, the engineers at Tecnomasio Italiano Brown Boveri (TIBB) encouraged the Italian State Railways (FS) to consider expanding its electric shunting fleet. They also recommended completing yard electrification where feasible, arguing that the initial expense would be offset by lower operational costs and the longer service life of electric shunting locomotives compared to diesel units. [47]

However, TIBB also acknowledged certain drawbacks to exclusive reliance on electric shunting, such as the necessity of maintaining a reserve fleet of fully autonomous (diesel) locomotives for emergency use during power supply failures or network maintenance. Additionally, safety regulations required a portion of yard tracks to remain non-electrified. [47]

Ultimately, FS chose not to expand electric shunting operations beyond the planned procurement. To mitigate the risk of accidents and the resulting legal complications, FS later initiated the de-electrification of many yard sidings. [48]

Studies and experiments

In 1972, during a series of discussions between representatives of the Ferrovie dello Stato (FS) and the Institute of Automation at the Faculty of Engineering of the University of Rome "La Sapienza," an agreement was reached to experimentally convert a locomotive of the E.323 class. The objective was to replace the rotary converter and the DC traction motor with an electronic converter suitable for powering a three-phase traction motor. [49]

This experiment was significant as it marked the first application worldwide of a three-phase traction motor on a 3 kV DC locomotive. The main technical challenges stemmed from the limitations of the power thyristors available at the time, which were suitable only for relatively low operating voltages and were highly sensitive to overvoltages. In 3,000 V DC electrification systems, such overvoltages could reach peak values of up to 12,000 V due to line inductance. [50]

Although the use of a shunting locomotive allowed only a limited demonstration of the benefits of a three-phase motor, the decision to experiment on the E.323 class was considered a practical compromise. These locomotives were equipped with a single traction motor of relatively low power, which minimized the complexity and cost of the conversion. [49]

Responsibilities were divided between the two institutions. The Institute of Automation was tasked with conducting the feasibility study, selecting the traction motor, designing and building a laboratory prototype of the converter, and developing the control circuits. FS was responsible for procuring the traction motor, constructing the final converter and auxiliary systems, reassembling the locomotive, and funding the entire project. [51]

It was also agreed to precede installation on the E.323 with a ground-based experimental application, conducted by the FS Experimental Institute at the electrical substation in Rome Magliana. [50]

The initial scope of the conversion focused solely on replacing the electrical traction equipment. However, the later decision to adopt a four-pole three-phase motor—advantageous in terms of mass and size compared to the originally planned six-pole motor—necessitated a change in the transmission ratio to accommodate the higher rotational speed. [50]

The new traction equipment included the following components: [50]

The locomotive was designed to deliver a constant tractive force, with power increasing linearly with speed up to approximately 79 kN (18,000 lbf) between 0 and 13 km/h (0.0 to 8.1 mph), and with slightly decreasing power—peaking at around 276 kW (370 hp)—from 13 km/h to the maximum speed. [52]

Electric braking was included in the design, without energy recovery to the line, with energy dissipated through a resistor. [53]

In 1973, FS allocated funding and studies commenced, resulting in the submission of a feasibility report in December 1974, which concluded favorably. [53]

By mid-1977, the progress of work was as follows: [53]

Following ground testing by the FS Experimental Institute of the electronic equipment developed by the Institute of Automation, advances in power electronics—particularly in connection with the E.402 locomotive project—led to declining interest in the E.323 inverter project, which was ultimately abandoned. [54]

Nicknames

Similar to the E.322, the E.324 engine trailer was nicknamed "dog" or "doggie" due to its perceived behavior of following the E.323 locomotive, as if walking on a leash held by its master. [55]

Chronological summary

Regarding the historical data of any class of railway rolling stock, two points from the introduction by engineer Fabio Cherubini—former manager of the FS Material and Traction Service and railway author—are notable:

The greatest care has been taken to identify the builders and years of construction of individual units based on FS documents, but errors or imperfections of various origins cannot be ruled out. Even the builders' license plates [56] do not give absolute certainty [...]

Fabio Cherubini, Materiale, p. 7)

E.323 series 000

E.323 locomotives

not suitable for remote control of E.324

Number

of service

Admission

in service [57]

Cancellation
E.323.0011966December 2002 [58]
E.323.0021966December 2002 [58]
E.323.0031966December 2002 [58]
E.323.0041966after 30/1/2000 [59]
E.323.0051966April 2004 [60]
E.323.0061966October 2002 [61]
E.323.0071966December 2002 [58]
E.323.0081966December 2003 [62]
E.323.0091966after 30/1/2000 [59]
E.323.0101966after 30/1/2000 [59]
E.323.0111970October 2002 [61]
E.323.0121970December 2002 [58]
E.323.0131971December 2002 [58]
E.323.0141971October 2002 [61]
E.323.0151971after 30/1/2000 [59]
E.323.0161971October 2002 [61]
E.323.0171971after 30/1/2000 [59]
E.323.0181971October 2002 [61]
E.323.0191971October 2002 [61]
E.323.0201971May 2003 [63]

E.323 and E.324 series 100 and 200

E.323 locomotives

suitable for remote control of E.324

E.324 locomotives

assigned in pairs

Number

of service

Admission

in service [57]

CancellationNumber

of service

Admission

in service [57]

Cancellation
E.323.1011966after 30/1/2000 [59] E.324.1011966February 2003 [63]
E.323.1021966after 30/1/2000 [59] E.324.1021966after 30/1/2000 [59]
E.323.1031966after 30/1/2000 [59] E.324.1031966after 30/1/2000 [59]
E.323.1041967August 2003 [64] E.324.1041967after 30/1/2000 [59]
E.323.1051967preserved as historic rolling stock [65] E.324.1051967preserved as historic rolling stock [65]
E.323.2011971April 2009 [66] E.324.2011971April 2009 [66]
E.323.2021971luglio 2003 [67] E.324.2021971August 2003 [64]
E.323.2031971April 2009 [66] E.324.2031971June 2009 [68]
E.323.2041971December 2003 [62] E.324.2041971October 2009 [69]
E.323.2051971April 2004 [60] E.324.2051971March 2003 [63]

See also

References

  1. Cornolò, Locomotive , pp. 291–292).
  2. 1 2 3 Cornolò, Dall'E.626 , pp. 302–306).
  3. 1 2 "Troop trains" are defined in railway regulations as the dispatch of wagons or carriages from one facility to another in a complex junction. Such trains, driven by drivers called "TMs" ("Tradotte e Manovre"), could exceed a mass of 1,000 tons in the early 1960s. Cf Cantini, Marco (2007). "Locomotive Diesel D.141". I Treni (299): 14.
  4. For the anomalous classification in classes E.323 and E.324, which descends from that of E.321 and E.322, cf Maurizio Grassi, Classificazione e dintorni delle locomotive F.S. a 3000 V c.c..
  5. Patelli, Stefano (2000). "Il comando multiplo nelle FS". Tutto Treno (131): 20–29.
  6. Nascimbene, Angelo (2012). "1967: rotabili FS in esposizione". Tutto Treno & Storia (27): 32–39.
  7. As of January 1, 1968, the FS electric locomotive fleet included 1669 3 kV direct current machines and 167 3.4 kV 16.7 Hz alternating current machines. Cf Giuseppe Vicuna (1968). Organizzazione e tecnica ferroviaria. Roma: Collegio Ingegneri Ferroviari Italiani. p. 402.
  8. Giuseppe Vicuna (1986). Organizzazione e tecnica ferroviaria (2 ed.). Roma: Collegio Ingegneri Ferroviari Italiani. pp. 698–699.
  9. By the end of the 1960s, when the experimental phase of Diesel and electric shunting locomotive operation was considered over, the FS Material and Traction Service had unified the respective preventive maintenance cycles by providing that Major Repairs, involving the disassembly and restoration of every part of the machine to a new state, would be interspersed with an "R III" repair involving only the general repair of the primary engines (thermal or electric depending on the type of locomotive) and the rearrangement of the electrical part. Cf Giuseppe Vicuna, Organizzazione e tecnica ferroviaria, Roma, Collegio Ingegneri Ferroviari Italiani, 1968, p. 544.
  10. Cornolò, Dall'E.626 , p. 302).
  11. Sergi, Tra Scilla , pp. 24–25).
  12. Caliri, Treni , p. 25).
  13. 1 2 Ferrovie dello Stato, PGOS 1963& Allegato III - Tabella 90, p. 278.
  14. Cacozza, Marco (2009). "Ai tempi di tradotte e manovre". Tutto Treno & Storia (21): 4–13.
  15. Ferrovie dello Stato, PGOS 1963& Art. 110 - Tabella 45, pp. 182-183.
  16. In the mechanics of railway locomotion, a line is defined as any extension of track connecting two points. A line consists of several sections of any given gradient and curve. Straight level tracks are defined as pairs of curves of infinite radius. Yard tracks are generally flat and straight, with the exception of diverted branches of switches.
  17. Nascimbene, Dove , p. 92).
  18. Croce, E 321 , p. 53).
  19. Haydock, Italian , pp. 23–24).
  20. Cherubini, Materiale , p. 12).
  21. As of June 2000, the Regional Transport Division had 11 E.323.000s, assigned to Alessandria (3), Bolzano (2), Foggia (1), Genoa Rivarolo (2), and Pisa (3), one E.323.200 assigned to Verona, and one E.324.200 assigned to Verona. Cf Pautasso, Sergio (2001). "Materiale motore Trasporto Regionale FS Trenitalia". Tutto Treno (138): 29.
  22. Voltan, Nascimbene, Pautasso, 80 anni , p. 49).
  23. "Arrivi e partenze". I Treni (numeri vari dal 246 al 231). 2003–2009.
  24. "Ferrovie, ancora a Rimini i rotabili "storici" fermi da anni". Ferrovie.it. 2019.
  25. Vergari, Fabio (2003). "Museo ferroviario in Puglia". I Treni (251): 11–15.
  26. 1 2 3 4 Barenghi, Nuove locomotive , p. 58/1).
  27. 1 2 The Ward Leonard system was used in particular industrial applications (e.g., hoisting plants, rolling mills, winding reels, and paper machines), which required DC motors with outstanding performance, such as starting without a rheostat, considerable possibility of overloading, regenerative braking, a remarkably wide and easily adjustable speed range, and the possibility of reversing the direction of travel without stopping the machine. The unit consisted of a three-phase primary motor that drove in rotation a dynamo with separate excitation and adjustable voltage, by means of which the final motor, also with separate excitation, was driven. Cfr Mario Pezzi, Macchine elettriche, Bologna, Zanichelli, 1967, pp. 211-214. The railway version adopted by the FS differed in replacing the three-phase primary motor with a DC motor and using a traction motor with series excitation, which was more suitable for railway needs.
  28. 1 2 The term "main generator" is used to distinguish the dynamo that powers the traction motor from the dynamos, called "auxiliary generators," which are used to power the excitation circuits of other electrical machines and the locomotive's control and lighting circuits.
  29. The speed of the DC motor is directly proportional to the voltage applied to its terminals and inversely proportional to the magnetic field produced by the excitation circuit. Reducing the excitation current thus causes a weakening of the magnetic field, which makes it possible to increase, within certain limits, the speed of rotation of the motor beyond the value corresponding to the maximum supply voltage.
  30. 1 2 3 4 5 6 7 8 9 Barenghi, Nuove locomotive , p. 58/5).
  31. 1 2 3 4 5 Barenghi, Nuove locomotive , p. 58/4).
  32. The so-called "unified class" included the 245.1001-1020, 2001-2020 and 6010-6124 series. Cfr Nascimbene, Angelo; Vanni, Luca (2002). FS Trenitalia. Locomotive Diesel. Albignasego: Duegi Editrice. pp. 42, 93, 94, 97. ISSN   1124-4232.
  33. 1 2 Marini, Le locomotive , pp. 85–86).
  34. 1 2 3 4 Vanni, Materiale , p. 311).
  35. The transmission bridge consisted of a set of gears that transferred the rotary motion received from the drive shaft to the drive axle.
  36. Marini, Le locomotive , p. 86).
  37. Barenghi, Nuove locomotive , pp. 58/4–5).
  38. Zattoni, Maffei, Le locomotive , p. 108).
  39. 1 2 3 Marzocchi, Locomotive , p. 27).
  40. The so-called "rheostatic starting" is done by inserting a set of limiting resistors (rheostat) in series with the DC motor, which are progressively excluded as the motor speed increases.
  41. Marzocchi, Locomotive , p. 25).
  42. 1 2 Zattoni, Maffei, Le locomotive , p. 109).
  43. Barenghi, Nuove locomotive , p. 58/2).
  44. 1 2 3 Zattoni, Maffei, Le locomotive& tav. II.
  45. Rolle, Le E.321-322 , p. 11).
  46. Croce, E 321 , pp. 49–50).
  47. 1 2 3 4 Barenghi, Nuove locomotive , p. 58/6).
  48. Cornolò, Dall'E.626 , p. 306).
  49. 1 2 Mascherpa, Il motore , p. 443).
  50. 1 2 3 4 Mascherpa, Il motore , p. 444).
  51. Mascherpa, Il motore , pp. 443–444).
  52. Mascherpa, Il motore , pp. 444–445).
  53. 1 2 3 Mascherpa, Il motore , p. 445).
  54. "Notizie flash". I Treni Oggi (63): 4. 1986.
  55. Croce, E 321 , pp. 50–52).
  56. Roberto Colasanti, Le targhe di costruzione, in I treni, 19 (1998), n. 193, pp. 14-17.
  57. 1 2 3 Cherubini, Materiale , p. 52).
  58. 1 2 3 4 5 6 Arrivi e partenze, in I treni, 24 (2003), n. 248, pp. 32-33.
  59. 1 2 3 4 5 6 7 8 9 10 11 The unit was reported to be in service as of January 30, 2000 (cf Cherubini, Materiale , p. 52)), but the date of cancellation is not available in the specialized literature.
  60. 1 2 Arrivi e partenze, in I treni, 25 (2004), n. 263, p. 32.
  61. 1 2 3 4 5 6 Arrivi e partenze, in I treni, 24 (2003), n. 246, pp. 12-13.
  62. 1 2 Arrivi e partenze, in I treni, 25 (2004), n. 259, p. 33.
  63. 1 2 3 Arrivi e partenze, in I treni, 24 (2003), n. 253, pp. 32-33.
  64. 1 2 Arrivi e partenze, in I treni, 25 (2004), n. 256, p. 31.
  65. 1 2 On consignment to the amateur association AISAF.
  66. 1 2 3 Arrivi e partenze, in I treni, 30 (2009), n. 319, p. 35.
  67. Arrivi e partenze, in I treni, 25 (2004), n. 255, p. 34.
  68. Arrivi e partenze, in I treni, 30 (2009), n. 321, p. 35.
  69. Arrivi e partenze, in I treni, 31 (2010), n. 330, p. 34.

Bibliography

Printed sources

Historiography and complements

开源整站镜像工具 关键词转码站群 网页镜像工具 站群镜像程序 关键词转码站群