英文互译镜像站

Cheung Tsing Tunnel

Last updated

Cheung Tsing Tunnel
Overview
Coordinates 22°20′56″N114°06′43″E / 22.34877°N 114.11188°E / 22.34877; 114.11188
StatusActive
SystemPart of Route 3 HK Route3.svg
Start Cheung Tsing Bridge
End Cheung Tsing Highway
Operation
Opened22 May 1997;27 years ago (1997-05-22)
Owner Hong Kong Government
Traffic Vehicular
Technical
Length1.6 km (0.99 mi)
No. of lanes 6 lanes (3 lanes per direction)
Operating speed70 km/h (45 mph)
  1. "CONSTRUCTION OF THE CHEUNG CHING TUNNEL". The National Academies of Sciences, Engineering, and Medicine. Retrieved 12 May 2021.
Cheung Tsing Tunnel
Cheung Tsing Tunnel 201811.jpg
Preceded by
Cheung Tsing Bridge
Hong Kong Route 3
HK Route3.svg
Cheung Tsing Tunnel
Succeeded by
Cheung Tsing Highway
镜像网站程序 站点核心词加权 镜像软件 MirrorElfR 网页镜像工具